South entrance during the re-leveling process.

Over the past several months, a great deal has been accomplished at the Manship House, and repair and restoration of the sidewalks is now underway.  Several brick walkways and large section of sidewalk were removed early in the project to facilitate re-leveling of the structure.  The walkways have been re-installed in their former locations, providing access to the front and side entrances.

South entrance after re-leveling, with reconstructed porch and steps.