Skip to content

Various stages of work showing construction of the piers that support the cable. The two lower pictures on the left show construction on the far bank of Bear Creek - the barge was used to transport stone across the creek by pulling on the suspended rope - all handled by hand.

Page created in: 0.864 seconds.